The challenge
As part of a parental leave replacement for the responsible facility manager at IKEA Wuppertal, a solution was required for the continuation of the technical and infrastructural facility management of the sales outlet.
The solution
Thanks to an interim facility management mandate, Peter Schmidt was able to continue the comprehensive tasks in regular operations and facility management without interruption. In addition to day-to-day operations, this also included service provider management, warranty management for the new building and the rectification of defects following expert inspections of the safety-relevant technical systems in the Wuppertal store.
At the end of the interim phase, all outstanding tasks were transferred to the responsible facility manager at IKEA as part of a structured handover and documentation on the completed projects was handed over.
Services :
Key data :
Store IKEA Wuppertal New building from the year of construction, 09/2016, 25,000 m² sales area, 36.500 m² GFA, furniture store with restaurant, 1087 parking spaces, outdoor area with tree register, comprehensive equipment of the building with TGA: BMA; SAA, EMA, safety lighting, 3 elevators, escalator, photovoltaic system, emergency power system, sprinkler system with three emergency diesel generators, medium-voltage electrical systems, BOS radio system, grease separator and additional sanitary technology, lightning protection, video surveillance systems for sales rooms and parking lot, High-bay warehouse, 4 escape tunnels with RDA, 7 HVAC systems sales and office areas, 1 HVAC system kitchen, refrigeration technology, geothermal heat pump with geothermal field, fully equipped canteen kitchen with cold storage cells, deep-freeze cells, dispensing technology and serving counters customer and staff restaurants, SHEVS, etc.